[Date Prev][Date Next] [Chronological] [Thread] [Archive Top]

[cdn-nucl-l] NRU restarted



Title: NRU restarted

UNRESTRICTED | ILLIMITÉ

As announced on the AECL web site http://www.aecl.ca/, NRU is back in operation at full power, for producing medical radioisotopes and neutrons for the National Research Council neutron scattering facility.  NRU was tested at low power over the past weekend.

An enormous amount of effort was expended by the dedicated restart team, to determine the cause of the leak (external corrosion on the calandria vessel), develop techniques to repair it (requiring tool development) with weld overlay (thanks to the additional welding expertise of Liburdi Engineering of Dundas, Ontario), make modifications to some systems to reduce the corrosion rate in the J-rod annulus, reassemble the core internals (instrumentation, control, fuel), and recommission many systems (many of which were also refurbished/repaired/upgraded).

My hats off to the restart team - a job well done!

cheers

Morgan




CONFIDENTIAL AND PRIVILEGED INFORMATION NOTICE

This e-mail, and any attachments, may contain information that
is confidential, subject to copyright, or exempt from disclosure.
Any unauthorized review, disclosure, retransmission, 
dissemination or other use of or reliance on this information 
may be unlawful and is strictly prohibited.  

AVIS D'INFORMATION CONFIDENTIELLE ET PRIVILÉGIÉE

Le présent courriel, et toute pièce jointe, peut contenir de 
l'information qui est confidentielle, régie par les droits 
d'auteur, ou interdite de divulgation. Tout examen, 
divulgation, retransmission, diffusion ou autres utilisations 
non autorisées de l'information ou dépendance non autorisée 
envers celle-ci peut être illégale et est strictement interdite.