The msg from Jaro about a symposium next year on the potential
siting of a new nuclear power plant in Renfrew County, takes me back to 1989
when I undertook a study for AECL on
the possible siting of a CANDU 3 at Rolphton. This included a visit to the old
NDP site at Rolphton, a look at the des Joachims dam upstream and downstream. This
hydro dam was part of the Hydro Quebec system but could possibly provide a reliable
source of back-up power supply. The site visit was followed by a visit to Ontario
Hydro headquarters to discuss; -
costs of
incorporation into the Ontario Hydro system - site location, cooling water, transmission lines. - safety related
requirements of a site, including a reliable source of Group 2 service water - possible upstream
dam failures. OH were planning to study postulated failure a series of dams upstream
and consequences downstream. My report which should be buried in the AECL files,
included a possible station and plant layout, both NSP and BOP, adjacent to the
old NDP. Neil G. Craik 130 Oxford Street Fredericton New Brunswick E3B 2W3 phone (506) 454
0274 email ncraik@nbnet.nb.ca
|